Nortel DMS-100 Manual page 317

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

4-110 Recovery procedures for individual devices and services
Recovering enhanced link peripheral processors
14
At the MAP
15
16
17
18
19
297-8021-545 Standard 14.02 May 2001
b
Push on the upper and lower edges of each faceplate to reseat the card
completely.
c
Close the locking levers on the card.
Repeat steps 3 through 13 for each ELPP in your office.
When all of the ELPPs are restored to power, continue this procedure at step
15.
To access the SRSTATUS level of the MAP display, type
>MAPCI;MTC;SRSTATUS
and press Enter
Example of a MAP display:
SRSTATUS
OVERALL STATUS Pend:
0
Quit
VIEW: SYSTEM
2
View_
Pend InPrg
3
List_ MS
0
4
NET
0
5
SER1
0
6
SER2
1
7
SER3
11
8
9
SRSTATUS:
From the MAP display, determine the state of the recovered Series III PMs
Note: The series III PM recovery status appears at the right of the word
SER3 of the MAP display. The recovery status is either pending, in
progress, complete, or failed.
If the number of Series III PMs,
that failed recovery
is zero
is other than listed here
To access the PM level of the MAP display, type
>PM
and press the Enter key.
To display a list of all system busy PMs, type
>DISP
STATE
SYSB
and press the Enter key.
Determine which of the Series III PM types are system busy.
If
LIMs are SysB
18%
InProg: 9%
Comp
Fail
0
2
0
IOD
0
6
0
Other 21
1
6
0
1
60
1
8
30
1
Do
step 32
step 17
Do
step 21
(continued)
Comp: 70%
Fail: 3%
11:52:34
Pend
InPrg
Comp
5
5
30
3
13
Fail
2
3

Advertisement

Table of Contents
loading

Table of Contents