Commissioning
5.4 Quick commissioning
Procedure
1. Open the control panel.
2. Assume master control for the converter.
3. Set the drive to enable state.
4. Switch on the motor.
The converter starts the motor data identification. This measurement can take several
minutes.
Depending on the setting, after motor data identification has been completed, the
converter switches off the motor - or it accelerates it to the currently set setpoint.
5. If required, switch off the motor.
6. Relinquish the master control after the motor data identification.
7. Save the settings in the converter (RAM → EEPROM) (Page 116).
You have completed the motor data identification.
Self-optimization of the speed control
If you have not only selected motor data identification with the motor stationary, but also
rotating measurement with self-optimization of the speed control, you must switch on the
motor again as described above and wait for the optimization run to finish.
Quick commissioning has been completed once the motor data identification has been
successfully completed.