Data Regarding The Power Loss In Partial Load Operation - Siemens SINAMICS G115D Operating Instructions Manual

Distributed drive for conveyor technology control
Hide thumbs Also See for SINAMICS G115D:
Table of Contents

Advertisement

10.4

Data regarding the power loss in partial load operation

You can find data regarding power loss in partial load operation in the Internet:
10.5
Electromagnetic compatibility of the converter
EMC (electromagnetic compatibility) means that the devices function satisfactorily without
interfering with other devices and without being disrupted by other devices. EMC applies
when the emitted interference (emission level) and the interference immunity are matched
with each other.
The product standard IEC/EN 61800-3 describes the EMC requirements placed on "Variable-
speed drive systems".
A variable-speed drive system (or Power Drive System PDS) consists of the converter as well
as the associated electric motors and encoders including the connecting cables.
The driven machine is not part of the drive system.
Note
PDS as component of machines or systems
When you install PDS into machines or systems, additional measures may be required so that
the product standards of these machines or systems is complied with. The machine or system
builder is responsible for taking these measures.
SINAMICS G115D distributed drive
Operating Instructions, 12/2020, FW V4.7 SP13, A5E48681219B-002
Partial load operation (https://support.industry.siemens.com/cs/ww/en/view/94059311)
10.4 Data regarding the power loss in partial load operation
Technical data
381

Advertisement

Table of Contents
loading

Table of Contents