Starting The Commissioning Wizard; Carrying Out Quick Commissioning - Siemens SINAMICS G115D Operating Instructions Manual

Distributed drive for conveyor technology control
Hide thumbs Also See for SINAMICS G115D:
Table of Contents

Advertisement

5.4.2.3

Starting the Commissioning Wizard

Procedure
1. Select your project and click on the
2. In the following screen form, select the converter with which you wish to go online.
3. Once you are online, select the following command from the project tree:
You have started the Commissioning Wizard of the converter.
5.4.2.4

Carrying out quick commissioning

Procedure
Select motor control mode.
Select the I/O configuration to pre-assign the converter interfaces.
• Set the applicable motor standard and the converter supply voltage.
• Select the application for the drive:
– [0] Load cycle with high overload: for applications requiring a high dynamic
– [1] Load cycle with low overload: for applications that do not require a high dynamic
• Set the pulse frequency for the converter.
If an external braking resistor is installed, you must set the maximum permissible braking
power of the braking resistor.
SINAMICS G115D distributed drive
Operating Instructions, 12/2020, FW V4.7 SP13, A5E48681219B-002
Motor control (Page 254)
Factory interface setting (Page 77)
performance, e.g. conveyor systems.
performance, e.g. pumps or fans.
5.4 Quick commissioning
button to establish the online connection.
Commissioning
111

Advertisement

Table of Contents
loading

Table of Contents