Genie S-60 Service Manual page 246

Hide thumbs Also See for S-60:
Table of Contents

Advertisement

Third Edition • First Printing
6 Remove the drive pump from the machine.
Component damage hazard.
Be sure to open the two hydraulic
tank valves and prime the pump
after installing the pump.
Before installing the pump, verify
proper pump coupler spacing.
Refer to the appropriate flex plate
installation instructions for your
engine.
How to Prime the Pump
Component damage hazard. Be
sure that the hydraulic tank shutoff
valves are in the
before priming the pump. The
engine must not be started with
the hydraulic tank shutoff valves in
the
CLOSED
damage will occur.
1 Connect a 0 to 600 psi (0 to 41 bar) pressure
gauge to the diagnostic nipple on the drive
pump.
2 Gasoline/LPG models: Close the valve on the
LPG tank, then disconnect the hose from the
tank. Move the fuel select toggle switch to the
LPG position.
Part No. 65196
position
OPEN
position or component
Genie S-60 & Genie S-65
Section 7 • Repair Procedures
Deutz Diesel models: Hold the manual fuel
shutoff valve clockwise to the
a
manual fuel shutoff valve
Perkins Diesel models: Disconnect the engine
wiring harness from the fuel solenoid at the
injector pump.
3 Crank the engine with the starter motor for
15 seconds, wait 15 seconds, then crank the
engine an additional 15 seconds or until the
pressure reaches 250 psi (17.2 bar).
4 Gasoline/LPG models: Connect the LPG
hose to the LPG tank and open the valve on the
tank.
Deutz Diesel models: Release the manual
shutoff valve.
Perkins Diesel models: Connect the engine
wiring harness to the fuel solenoid.
5 Start the engine from the ground controls and
check for hydraulic leaks.
HYDRAULIC PUMPS
position.
CLOSED
a
7 - 43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-65

Table of Contents