Proc0; Proc1 - IBM i 830 Repair Manual

Table of Contents

Advertisement

PROC0

The failing item a system processor card.
1. Attempt a SLOW OVERRIDE IPL to run full processor hardware diagnostics.
Power off the system from the control panel. Change the IPL mode to manual,
and the IPL speed to SLOW OVERRIDE (S) using control panel function 2.
Power on the system.
Does the same SRC occur ?
Yes
No
Follow the service actions for the new SRC.
2. Is this system a Model 830 with SB2 System Unit and FC 9074 ?
Yes
No
Go to Step 4 of this procedure.
3. See "Locations — Models 830, SB2 System Unit with FC 9074 Base I/O Tower"
on page 709.
Replace the following FRUs in order one at a time until the problem is
resolved. See "Chapter 4. Removal and Installation Procedures" on page 617.
Note: Be sure to IPL in SLOW OVERRIDE mode after each replacement.
a. Processor Card in location M03 in the System Unit
4. This is a Model 840, SB3 System Unit and FC 9079 Base I/O Tower.
See "Locations — Models 840, SB3 System Unit with Processor Tower and FC
9079 Base I/O Tower" on page 719. Replace the following FRUs in order one at
a time until the problem is resolved. See "Chapter 4. Removal and Installation
Procedures" on page 617.
Note: Be sure to IPL in SLOW OVERRIDE mode after each replacement.
a. Processor Card 0 in location M05 in the System Unit
This ends the procedure.

PROC1

The failing item a system processor card.
1. Attempt a SLOW OVERRIDE IPL to run full processor hardware diagnostics.
Power off the system from the control panel. Change the IPL mode to manual,
and the IPL speed to SLOW OVERRIDE (S) using control panel function 2.
Power on the system.
Does the same SRC occur ?
Yes
No
Follow the service actions for the new SRC.
2. Is this system a Model 830 with SB2 System Unit and FC 9074 ?
Yes
No
Go to Step 4 on page 570 of this procedure.
3. See "Locations — Models 830, SB2 System Unit with FC 9074 Base I/O Tower"
on page 709.
Replace the following FRUs in order one at a time until the problem is
resolved. See "Chapter 4. Removal and Installation Procedures" on page 617.
Chapter 3. Problem Isolation Procedures (PIPs), Failing Items, and Symbolic FRU Isolation
Symbolic FRUs
569

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

I sb3I 840I sb2

Table of Contents