Bus Pip Verify - Ra - IBM i 830 Repair Manual

Table of Contents

Advertisement

Yes
No
Go to step 15 of this procedure.
16. Did you locate a resource with a "System card" value that matches the decimal
Cc value from step 14 of this procedure?
Yes
No
You will not be able to locate the card using DST. Go to step 6 of this
procedure to locate the card.
17. Record the frame ID, card position and part number of the resource. Return to
the procedure that sent you here.
This ends the procedure.

BUS PIP VERIFY - RA

This procedure will verify a repair for the high-speed link, for a system PCI Bus, or
for a multi-adapter bridge.
Note: Within this procedure the terms "system" and "logical partition" are
interchangeable when used individually.
Perform this procedure from the logical partition you were in when you were sent
to this procedure.
To determine which logical partition owns an I/O resource or to locate the console
of a secondary partition, see the iSeries Service Functions information.
Perform the following procedure to ensure that the system functions correctly after
you perform an HSL, PCI or multi-adapter bridge isolation procedure. Use this
procedure to verify an HSL, PCI or multi-adapter bridge repair.
1. If you were previously told to power off a system or logical partition or an
expansion tower during this service action, then you need to make sure to
power it off again at this time.
2. Install all cards, cables, and hardware, ensuring that all connections are tight.
You can use the system configuration list to verify that the cards are installed
correctly.
3. Power on any expansion tower, logical partition or system unit that was
powered off during the service action.
v If the system or a logical partition was powered off during the service
action, does the IPL complete successfully to the IPL or does Install the
System display?
or
v If an expansion tower was powered off during the service action, does the
expansion tower power on complete successfully?
or
v If any IOP or IOA card locations were powered off using concurrent
maintenance during the service action, do the slot(s) power on successfully?
or
v If you exchanged a FRU that should appear as a resource(s) to the system,
such as an IOA, or I/O Bridge, does the new FRU's resource(s) appear in
HSM as operational?
Yes
No
Chapter 3. Problem Isolation Procedures (PIPs), Failing Items, and Symbolic FRU Isolation
Bus, High-Speed Link (HSL) PIPs
323

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

I sb3I 840I sb2

Table of Contents