Mazda CX-7 2007 Workshop Manual page 754

2007 mazda cx-7
Hide thumbs Also See for CX-7 2007:
Table of Contents

Advertisement

Rear Cover Assembly Note
Caution
• Clean away the old sealant before applying the new sealant.
• Install the rear differential within 10 minutes after applying sealant.
• Allow the sealant to set at least 30 minutes after installation before filling the differential with the
specified oil.
1. Clean the alignment surface of the carrier and rear cover, and apply a thin coat of sealant.
2. Install the rear cover.
Tightening torque
15.7— 22.6 N·m {1.6— 2.3 kgf·m, 11.6— 16.6 ft·lbf}
Oil Seal Assembly Note
1. Apply differential oil to the new oil seal lip.
2. Assemble the oil seal using the SSTs.
Substitution SST
• 49 G030 796
Outer diameter: 56— 60 mm {2.21— 2.36 in}
Inner diameter: 49.8 mm {1.96 in} or more
Inner depth: 8.7 mm {0.34 in} or more
End Of Sie
03-14–18
DIFFERENTIAL
49 G030 797
49 G030 796
acxuuw00001436

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents