Mazda CX-7 2007 Workshop Manual page 740

2007 mazda cx-7
Hide thumbs Also See for CX-7 2007:
Table of Contents

Advertisement

6. Pull the companion flange off using the SST.
7. Remove the oil seal from the differential carrier
using a screwdriver or similar tool.
8. Apply differential oil to the new oil seal lip.
9. Install the new oil seal to the differential carrier
using the SST.
Substitution SST
• 49 W011 102
Outer diameter: 66 mm {2.60 in} or more
Inner diameter: 54— 60 mm {2.13— 2.36 in}
or more
Inner depth: 17.5 mm {0.69 in} or more
10. Install the companion flange to the drive pinion.
11. Jack up the differential and install the front side of
the differential mount.
Tightening torque
75.5— 102 N·m {7.7— 10.4 kgf·m, 55.7— 75.2
ft·lbf}
12. Install the washer and a new locknut.
13. Tighten the locknut to the specified torque using
the SST.
Tightening torque
167— 226 N·m {17.1— 23.0 kgf·m, 124— 166
ft·lbf}
14. Install the propeller shaft. (See 03-15-3
PROPELLER SHAFT REMOVAL/
INSTALLATION.)
15. Add the specified differential oil from the filler
plug. (See 03-14-2 DIFFERENTIAL OIL
REPLACEMENT.)
End Of Sie
03-14–4
DIFFERENTIAL
49 S120 710
49 0839 425C
acxuuw00001375
49 W011 102
acxuuw00001376
acxuuw00001377

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents