Final Diagnostic Tests; Final Test Preparation; Fibre Channel Tests - ADIC Scalar 100 User Manual

Quantum scalar 100: user guide
Hide thumbs Also See for Scalar 100:
Table of Contents

Advertisement

3. Insert and tighten the retaining screws (A).

Final Diagnostic Tests

After a FRU has been replaced, a complete diagnostic check must be performed
to verify the new FRU and to ensure that no new problems have been introduced.
For further information about the procedures and commands used in this section,
see:

Final Test Preparation

1. Attach the service terminal and power cord to the ADIC Gateway.
2. Turn on the ADIC Gateway and wait until it has finished booting.
3. From the Service Terminal, enter the diagBoot command.
4. Wait until the ADIC Gateway has finished booting into diagnostic mode.
5. From the Service Terminal, enter the showBox command.
6. Verify that the ADIC Gateway accurately displays the channel information
7. If the showBox display is accurate, go to step 9. If not, go to "Start MAP" on
page 157.
8. Proceed to "Fibre Channel Tests" below.

Fibre Channel Tests

T
F
EST
IBRE
1. If there is a dual-port PMC in Slot 1, got to Step 5.
2. Attach the Fibre Channel loop back plug to the card in slot 1.
3. From the service terminal, enter the fcSlotTest 1 command.
4. If the test passed, remove the loop back plug and go to Test Fibre PMC Slot 2.
If not, go to "Start MAP" on page 157.
5. Attach the Fibre Channel loop back plug to slot 1.
6. From the service terminal, enter the fcSlotTest 1 command.
208
"Connecting to the Service Port" on page 217
"Diagnostic Command Reference" on page 295
PMC S
1
LOT
Final Diagnostic Tests

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scalar 1000Scalar 10kSnc 3000Snc/gateway 3000

Table of Contents