Table 3-2: Installation Steps
15
Step
16
17
18
Installation Checklist
Power down the FC
host(s).
Connect the FC cables
from the FC HBA(s) to the
ADIC Gateway.
Power up the FC host(s)
User Action or Decision
Issue fcShow command
from the service terminal
to show the status of each
FC interface that is
installed and connected.
Issue fcShowDevs
command from the service
terminal to show SCSI
target devices that are
connected as seen by the
Fibre Channel interface
Verify all target devices
are available to the host
system(s)
Perform steps in Table 3-
3, on page 36 "Post-
Installation Checklist"
If SAN Connection Status LED for the
attached host(s) is not on, check FC
cables. You may have to change the
polarity of the FC cables. If problem
persists, go to "Fibre Channel MAP" on
page 178
Comments and References
See "Service Port Command Reference"
on page 223.
In the output of the fcShow command,
look for the Firmware State column. If the
word Ready does not appear, go to
"Fibre Channel MAP" on page 178.
Check to see that all SCSI target devices
are seen by each FC interface. If not, go
to "SCSI MAP" on page 171
Use appropriate host system utilities for
disk and tape. If all devices are NOT
available, reboot host system(s) and
check again. If problem persists, go to
"Start MAP" on page 157
In SAN Configuration, two specific areas
require understanding and attention:
Access Control
Save Configuration
For more information on these, see
"Understanding SAN Configurations" on
page 53