Function modules
7.11 Extended stop and retract
7.11.4.3

Regenerative operation

In the case of a fault, the objective is to buffer the DC link until all of the drives connected to
the DC link and enabled by ESR have reached their configured final position. To achieve
this, a suitable drive in the drive line-up, for example a spindle drive, is braked in generator
operation. The DC-link voltage is then monitored by the V
Configuring the "Generator operation" response
1. Set the generator operation of the drive with the parameter setting p0888 = 3.
2. Parameterize the V
3. Activate the monitoring of the DC-link voltage for the generator operation with the
4. Set the permissible lower voltage limit V
522
controller.
dc
parameter setting p1240 = 2.
The infeed detects when the power fails as the DC-link voltage drops and this is then
signaled as an alarm.
Figure 7-31
DC-link voltage setpoint
controller.
dc_min
of the DC link via parameter p1248.
dc_min
Function Manual, (FH1), 01/2013, 6SL3097-4AB00-0BP3