Section 5: Parts and Module Replacement
2.4

REPLACEMENT PROCEDURES

2.4.1 TOOLS REQUIRED

• Low and high security keys
• Phillips™ screwdrivers - #1, #2 and #3 long stems
• Allen™ keys
• Hex keys - 1.5mm, 2mm, 2.5mm, 3mm and 5mm
• Nut drivers - 8mm, 17mm, 3/16" and 9/16"
• Electrostatic protective strap and pad
• Disposable Nitrile gloves

2.4.2 SERVICING GUIDELINES

• Always power down and disconnect power sources prior to servicing.
• Follow all service safety guidelines.
• Refer to Table 2.2 to locate each module within the projector.
• When re-installing a module, follow "removal" instructions in reverse unless otherwise indicated.
• Refer to
Section 6 Interconnections
2-6
(included with optical components)
when re-connecting harnesses.
CP2000-M/MR Service Booklet