Liquid Cooling Assembly - Christie CP2000-M Service Booklet

Hide thumbs Also See for CP2000-M:
Table of Contents

Advertisement

Section 5: Parts and Module Replacement

2.8.2 LIQUID COOLING ASSEMBLY

The liquid cooling assembly consists of a pump, coolant reservoir, radiator and heat sinks. All are
connected together with hoses and mounted within the front portion of the projector.
(30 minutes)
1. Remove top lid. Refer to
2. Remove side access panel. Refer to
3. Use a #2 Phillips™ to remove the 2 screws securing the reservoir (Figure 2-53).
4. Disconnect the red and blue quick disconnects on the cooling hoses (Figure 2-54).
5. Use a #2 Phillips™ to remove the 3 screws securing the liquid cooling assembly to the frame.
6. Pull the assembly straight out of the projector by tilting upwards.
7. Reverse the above steps to install.
2-46
2.5.5 Top Lid, on page
2-10.
2.5.9 Exhaust Panel Skin, on page
F
2-53 R
R
IGURE
EMOVE
F
2-54 Q
D
IGURE
UICK
ISCONNECTS
2-13.
H
EFILL
OSE
CP2000-M/MR Service Booklet
020-100220-02 Rev. 1 (07/08)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp2000-mr

Table of Contents