Important Notes; Legal Bases; Subject To Changes; Personnel Qualification - WAGO -I/O-IPC-C6 Manual

Wago-i/o-system 750
Hide thumbs Also See for WAGO-I/O-IPC-C6:
Table of Contents

Advertisement

14

Important Notes

Pos: 13 /Alle Serien (Allgemeine Module)/Überschriften für alle Serien/Wichtige Erläuterungen/Wichtige Erläuterungen - Überschrift 1 @ 4\mod_1241428899156_21.doc @ 32170 @ 1 @ 1
2
Important Notes
Pos: 14 /Alle Serien (Allgemeine Module)/Wichtige Erläuterungen/Einleitung Wichtige Erläuterungen @ 3\mod_1221059818031_21.doc @ 21717 @ @ 1
This section includes an overall summary of the most important safety
requirements and notes that are mentioned in each individual section. To protect
your health and prevent damage to devices as well, it is imperative to read and
carefully follow the safety guidelines.
Pos: 15 /Alle Serien (Allgemeine Module)/Überschriften für alle Serien/Wichtige Erläuterungen/Rechtliche Grundlagen - Überschrift 2 @ 3\mod_1221060626343_21.doc @ 21726 @ 2 @ 1
2.1

Legal Bases

Pos: 16 /Alle Serien (Allgemeine Module)/Wichtige Erläuterungen/Änderungsvorbehalt - Überschrift 3 und Inhalt @ 3\mod_1221060036484_21.doc @ 21720 @ 3 @ 1
2.1.1

Subject to Changes

WAGO Kontakttechnik GmbH & Co. KG reserves the right to provide for any
alterations or modifications that serve to increase the efficiency of technical
progress. WAGO Kontakttechnik GmbH & Co. KG owns all rights arising from
the granting of patents or from the legal protection of utility patents. Third-party
products are always mentioned without any reference to patent rights. Thus, the
existence of such rights cannot be excluded.
Pos: 17 /Serie 758 (Funk, IPC und PFC)/Wichtige Erläuterungen/Personalqualifikation 758-87x @ 10\mod_1312347708919_21.doc @ 75562 @ 3 @ 1
2.1.2

Personnel Qualification

All sequences performed on the I/O-IPC shall only be carried out by electricians
with appropriate knowledge in the field of automation technology. These
specialists must be familiar with the current norms and guidelines for I/O-IPCs
and automated environments.
All changes made to the control system shall always be performed by specialists
with the appropriate knowledge of PLC programming. Detailed knowledge of
Linux is required when making changes to this operating system.
Pos: 18 /Dokumentation allgemein/Gliederungselemente/---Seitenwechsel--- @ 3\mod_1221108045078_0.doc @ 21810 @ @ 1
WAGO-I/O-SYSTEM 750
758-874/000-131 WAGO-I/O-IPC-C6
Manual
Version 1.0.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

I/o-system 750758-874/000-111

Table of Contents