Data Transfer to MC Unit and Test Operation
6.5.3 JOG Operation with Tool Operation Function
• You can perform commissioning with CMI before actually starting user programs.
• The following procedure is explained on the condition that CMI has already started.
PROCEDURE
1. Select "Online" > "Tool Operation" from the menu bar.
The "Tool operation" dialog box is displayed.
2. Select "JOG operation" from the tool operation dialog box.
The "Tool operation - JOG operation" dialog box is displayed.
3. Press [+] or [-] button in the JOG field.
The JOG operation is executed.
4. Press [Exit] button to terminate the JOG operation.
6-16