Table 6-1: T200H/M Preventive Maintenance Schedule - Teledyne T200H User Manual

Nitrogen oxides analyzer
Table of Contents

Advertisement

ITEM
ACTION
Particulate Filter
Change filter
Review and
Verify Test Functions
evaluate
Evaluate offset and
Zero/Span Check
slope
Zero/Span
Zero and span
Calibration
calibration
Replace converter
NO
Converter
2
& check efficiency
External, 2-stage
Zero Air Scrubber
Exchange chemical
(Optional)
Reaction Cell
Clean optics,
Window
Change O-rings
Air Inlet Filter Of
Change particle
Permeation Dryer
filter
Pneumatic Sub-
Check for leaks in
System
gas flow paths
All Critical Flow
Orifice O-Rings &
Replace
Sintered Filters
1
Pump
Rebuild head
Inline Exhaust
Replace
Scrubber
PMT Sensor
Low-level hardware
Hardware Calibration
calibration
1
A pump rebuild kit is available from Teledyne API Technical Support including all instructions and required parts (the pump part number is on the label of the pump itself).

Table 6-1: T200H/M Preventive Maintenance Schedule

CAL
MANUAL
FREQUENCY
CHECK
SECTION
Weekly
No
6.3.1
(or as needed)
6.2; Appendix
Weekly
No
Weekly
--
5.4, 5.6, 5.8
5.2, 5.5, 5.8,
Every 3 months
--
5.9
Every 3 years or if
Yes if CE
conversion efficiency
factor is
< 90%
used
Every 3 months
No
3.5.3.2
(or as needed)
Annually or as
Yes
6.3.5
necessary
Annually
No
6.3.1, 6.3.2
Annually or after
Yes on
repairs involving
leaks, else
7.5.1, 7.5.2
pneumatics
no
Annually
Yes
6.3.6
Annually
Yes
6.3.3.1
Annually
No
On PMT/ preamp
changes & if
Yes
7.6.4
0.7< SLOPE >1.3
C
--
--
DATE PERFORMED