Oracle X5-8 Service Manual page 191

Table of Contents

Advertisement

1.
Prepare the server for hot service. See
Service" on page
Alternatively, to prepare the server for cold service, see
Service" on page
98.
2.
Identify the DPCC PCIe slot.
3.
If necessary, remove the DPCC. See
Orient the DPCC so that the hinge is to the left.
4.
To open the top of the DPCC, lift the release latch at the non-hinged end of the
5.
lid and rotate the lid upward and to the left.
Ensure that the DPCC top cover is open.
6.
The top of the DPCC is hinged at one end. To open, lift the tab on the non-hinged end.
95.
"Remove a DPCC" on page
"Prepare the Server for Hot
"Prepare the Server for Cold
Servicing Components
Install a PCIe Card
185.
191

Advertisement

Table of Contents
loading

Table of Contents