Related
Documentation
Installing an MX960 AS MSC
Copyright © 2017, Juniper Networks, Inc.
Figure 107: Installing an AS MLC
Preventing Electrostatic Discharge Damage to an MX960 Router
Installing an MX960 AS MSC on page 299
Installing an MX960 AS MXC on page 301
Removing an MX960 AS MLC on page 313
To install an AS MSC (see
Attach an ESD grounding strap to your bare wrist and connect the strap to one of the
1.
ESD points on the chassis.
Align the notches in the connector at the rear of the AS MSC with the notches in the
2.
AS MSC slot (slot
—the top slot in the AS MLC ), and then slide the AS MSC in until
0
it lodges firmly in the AS MLC.
Figure 108 on page
300):
Chapter 21: Installing Components
299