Juniper MX960 Hardware Manual page 442

3d universal edge router
Hide thumbs Also See for MX960:
Table of Contents

Advertisement

MX960 3D Universal Edge Router Hardware Guide
412
Place the ejector handles in the proper position, vertically and toward the center of
5.
the board.
Check the LEDs on the SCB faceplate to verify that it is functioning normally.
6.
The green
LED should light steadily a few minutes after the SCB is installed.
OK/FAIL
If the
LED is red, remove and install the SCB again. If the
OK/FAIL
lights steadily, the SCB is not functioning properly. Contact your customer support
representative.
Check the status of the SCB using the
7.
user@host> show chassis environment cb
CB 0 status:
State
Temperature
Power 1
1.2 V
1.5 V
1.8 V
2.5 V
3.3 V
5.0 V
12.0 V
1.25 V
3.3 V SM3
5 V RE
12 V RE
Power 2
11.3 V bias PEM
4.6 V bias MidPlane
11.3 V bias FPD
11.3 V bias POE 0
11.3 V bias POE 1
Bus Revision
FPGA Revision
CB 1 status:
State
Temperature
Power 1
1.2 V
1.5 V
1.8 V
2.5 V
3.3 V
5.0 V
12.0 V
1.25 V
3.3 V SM3
5 V RE
12 V RE
Power 2
11.3 V bias PEM
4.6 V bias MidPlane
11.3 V bias FPD
11.3 V bias POE 0
11.3 V bias POE 1
Bus Revision
FPGA Revision
show chassis environment cb
Online Master
25 degrees C / 77 degrees F
1198 mV
1508 mV
1830 mV
5059 mV
6593 mV
5111 mV
12181 mV
1250 mV
6587 mV
5078 mV
12026 mV
11253 mV
4827 mV
11408 mV
11446 mV
11408 mV
6
0
Online Standby
26 degrees C / 78 degrees F
1211 mV
1517 mV
1817 mV
2507 mV
3312 mV
5136 mV
12142 mV
1260 mV
3306 mV
5085 mV
11968 mV
11369 mV
4814 mV
11427 mV
11350 mV
11330 mV
39
1
Copyright © 2017, Juniper Networks, Inc.
LED still
OK/FAIL
command:

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx960 3d

Table of Contents