Table 97: Mounting Hardware Hole Locations For Center-Mounting In An Open-Frame Rack - Juniper MX960 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX960:
Table of Contents

Advertisement

MX960 3D Universal Edge Router Hardware Guide
200
Table 97: Mounting Hardware Hole Locations for Center-Mounting in an
Open-Frame Rack
Hole
Distance Above U Division
30
17.26 in. (43.8 cm)
27
15.51 in. (39.4 cm)
24
13.76 in. (34.9 cm)
21
12.01 in. (30.5 cm)
18
10.26 in. (26.0 cm)
15
8.51 in. (21.6 cm)
12
6.76 in. (17.1 cm)
9
5.01 in. (12.7 cm)
6
3.26 in. (8.3 cm)
3
1.51 in. (3.8 cm)
2
0.88 in. (2.2 cm)
1
0.25 in. (0.6 cm)
To install the large mounting shelf (see
On the rear of each rack rail, partially insert a mounting screw into the highest hole
1.
specified in
Table 97 on page 200
Install the large shelf on the rack. Hang the shelf over the mounting screws using the
2.
keyhole slots located near the top of the large shelf flanges.
Partially insert screws into the open holes in the flanges of the large shelf.
3.
Tighten all the screws completely.
4.
Large Shelf
9.86 U
X
8.86 U
X
7.86 U
X
6.86 U
X
5.86 U
X
4.86 U
X
3.86 U
X
2.86 U
X
1.86 U
X
0.86 U
X
0.50 U
X
0.14 U
Figure 54 on page
for the large shelf.
Copyright © 2017, Juniper Networks, Inc.
201):

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx960 3d

Table of Contents