Mx960 Rack Requirements - Juniper MX960 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX960:
Table of Contents

Advertisement

Table 65: MX960 Site Preparation Checklist (continued)
Item or Task
Select the type of rack or cabinet.
Plan rack or cabinet location, including required
space clearances.
If a rack is used, secure rack to floor and building
structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Measure distance between external power
sources and router installation site.
Calculate the optical power budget and optical
power margin.
Related
Documentation

MX960 Rack Requirements

Copyright © 2017, Juniper Networks, Inc.
For More Information
"MX960 Cabinet Size and Clearance
Requirements" on page
"MX960 Rack Requirements" on
page 125
"MX960 Cabinet Size and Clearance
Requirements" on page
"MX960 Rack Requirements" on
page
125,
"Clearance Requirements for Airflow
and Hardware Maintenance for the
MX960 Router" on page 128
"MX960 Rack Requirements" on
page 125
"MX960 Router Grounding
Specifications" on page 145
"Calculating Power Budget and
Power Margin for Fiber-Optic Cables"
on page 140
Installing an MX960 Router Overview on page 203
Unpacking the MX960 Router on page 189
The router can be installed in many types of racks, including four-post (telco) racks and
open-frame racks. An example of an open-frame rack appears in
Chapter 9: Preparation Overview
Performed By
130,
130,
Figure 41 on page
Date
126.
125