3.3.2.2
Requirements on the levelness of the floor
The foundation at the installation location of the cabinet devices must be level to ensure
proper functioning of the cabinet units.
● Care must be taken to ensure that the doors can be opened and closed and that the
● Flat sections (such as doors, side panels and hoods) must be sealed correctly to ensure
● When cabinets are connected (e.g., transport units), air must be prevented from entering
Figure 3-1
The following points must be observed to ensure full functionality of the cabinet units:
● The foundation must be level.
● Irregularities must be leveled out.
● Gaps where air can enter caused by leveling measures (e.g.:
Converter cabinet units
Operating Instructions, 03/2012, A5E03263466A
locking systems work properly.
compliance with the specified degree of protection.
through the gaps.
Requirements on the levelness of the floor
sealed.
Mechanical installation
3.3 Assembly
①
in the diagram) must be
45