Commissioning
5.5 First commissioning with the AOP30
Note
Make sure that the necessary enable signals have been assigned; otherwise motor
identification cannot be carried out.
Note
If a fault is present when selecting the stationary or rotary measurement, motor identification
cannot be carried out.
To rectify the fault, you must choose "No identification" to close the screen, then eliminate
the fault.
After this, motor identification can be selected again via <MENU> -
<Commissioning/service> - <Drive commissioning> - <Motor identification>.
5.5.3

Additional settings required for units that are connected in parallel

Additional settings must be made for units that are connected in parallel before selecting the
motor and entering the motor data via the operator panel:
● For 3 AC 380 to 480 V:
● For 3 AC 500 to 600 V:
● For 3 AC 660 to 690 V:
250
6SL3710-2GE41-1AAx, 6SL3710-2GE41-4AAx, 6SL3710-2GE41-6AAx
6SL3710-2GF38-6AAx, 6SL3710-2GF41-1AAx, 6SL3710-2GF41-4AAx
6SL3710-2GH41-1AAx, 6SL3710-2GH41-4AAx, 6SL3710-2GH41-5AAx
Converter cabinet units
Operating Instructions, 03/2012, A5E03263466A