Tensioning Deivce - SSANGYONG 1999 Musso Service Manual

Table of Contents

Advertisement

1B2-30 M161 ENGINE MECHANICAL
TENSIONING DEVICE
Preceding Work : Removal of tensioning device shock absorber
1 Bolt (M8 x 75, 2 pieces) +
Washer .......................................... 22.5-27.5 Nm
2 Bolt (M8 x 25, 1 pieces) +
Washer .......................................... 22.5-27.5 Nm
Removal & Installation Procedure
1. Turn the stud bolt to counterclockwise.
2. Insert the pin (111 589 01 15 00) into the hole in tensioning
arm.
3. Unscrew the bolts (1, 2) and remove the tensioning device.
Installation Notice
Tightening Torque
4. Installation should follow the removal procedure in the
reverse order.
3 Tensioning Device
4 Stud bolt
5 Tensioning Arm
22.5 - 27.5 Nm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents