Dodge ZB 2005 Service Manual page 1333

Table of Contents

Advertisement

STARTING
*NO RESPONSE FROM PCM WITH A NO START CONDITION —
TEST
9
NOTE: Before continuing, check the PCM harness connector terminals for
corrosion, damage, or terminal push out. Repair as necessary.
Using the schematics as a guide, inspect the wire harness and connectors. Pay
particular attention to all Power and Ground circuits.
If there is no possible causes remaining, view repair.
Repair
ACTION
Replace and program the Powertrain Control Module per Service
Information.
Perform POWERTRAIN VERIFICATION TEST VER - 1.
212
Continued
APPLICABILITY
All

Advertisement

Table of Contents
loading

Table of Contents