Dodge ZB 2005 Service Manual page 1139

Table of Contents

Advertisement

COMMUNICATION
*NO RESPONSE FROM PCM (SCI ONLY) —
TEST
4
Turn the ignition off.
Disconnect the DRBIII from the DLC.
Disconnect the PCM harness connectors.
Turn the ignition on.
Disconnect the Low Tire Pressure Warning Module harness connector (if equipped).
Measure the voltage of the SCI Transmit circuit at the DLC.
Is the voltage above 1.0 volt?
Yes → Repair the SCI Transmit circuit for a short to voltage.
→ Go To 5
No
5
Turn the ignition off.
Disconnect the DRBIII from the DLC.
Disconnect the PCM harness connectors.
Turn the ignition on.
Measure the voltage of the SCI Receive circuit at the DLC.
Is the voltage above 1.0 volt?
Yes → Repair the SCI Receive circuit for a short to voltage.
→ Go To 6
No
6
Turn the ignition off.
Disconnect the DRBIII from the DLC.
Disconnect the PCM harness connectors.
Measure the resistance between the SCI Transmit circuit and the SCI Receive circuit
at the PCM connector.
Is the resistance below 5.0 ohms?
Yes → Repair the short between the SCI Transmit and the SCI Receive
→ Go To 7
No
7
Turn the ignition off.
Disconnect the PCM C3 harness connector.
Disconnect the DRBIII from the DLC.
Measure the resistance between ground and the SCI Receive circuit.
Is the resistance below 5.0 ohms?
Yes → Repair the SCI Receive circuit for a short to ground.
→ Go To 8
No
8
Turn the ignition off.
Disconnect the PCM C3 harness connector.
Disconnect the DRBIII from the DLC.
Measure the resistance of the SCI Receive circuit between the PCM C3 connector and
the DLC.
Is the resistance below 5.0 ohms?
Yes → Go To 9
→ Repair the SCI Receive circuit for an open.
No
ACTION
Perform POWERTRAIN VERIFICATION TEST VER - 1.
Perform POWERTRAIN VERIFICATION TEST VER - 1.
circuits.
Perform POWERTRAIN VERIFICATION TEST VER - 1.
Perform POWERTRAIN VERIFICATION TEST VER - 1.
Perform POWERTRAIN VERIFICATION TEST VER - 1.
Continued
18
APPLICABILITY
All
All
All
All
All

Advertisement

Table of Contents
loading

Table of Contents