Powering On The T-Series Routing Platform; Verifying That The Jcs 1200 Platform Is Powered On Correctly - Juniper JCS 1200 Hardware Manual

Juniper control system platform
Hide thumbs Also See for JCS 1200:
Table of Contents

Advertisement

Juniper Control System (JCS) 1200 Platform Hardware Guide

Powering On the T-series Routing Platform

After you have connected the control planes between the T-series routing platform
and the JCS 1200 platform, power on the routing platform, monitor the boot process,
and verify the connections. Follow this procedure:
1.
2.
NOTE: After powering off a power supply, wait at least 60 seconds before powering
it back on. After powering on a power supply, wait at least 60 seconds before
powering it off.
If the system is completely powered off when you power on the power supply, the
Routing Engine boots as the power supply completes its startup sequence. If the
Routing Engine finishes booting and you need to power off the system again, first
issue the CLI
After a power supply is powered on, it can take up to 60 seconds for status
indicators—such as the output status LED on the power supply, the
command display, and messages on the LED display on the craft interface—to indicate
that the power supply is functioning normally. Ignore error indicators that appear
during the first 60 seconds.
3.
4.
NOTE: You do not need to reboot the JCS 1200 platform after the routing platform
has booted.
Related Topics
78
Powering On the T-series Routing Platform
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
connect the strap to one of the ESD points on the chassis.
Switch the circuit breakers on one of the power supplies to the on position (
and observe the LEDs on the power supply faceplate. If the power supply is
correctly installed and is functioning properly, the
the
LED blinks momentarily, then lights steadily.
CB ON
request system halt
Repeat Step 2 for the remaining power supply.
On an external management device connected to the console or auxiliary port
of the CIP, monitor the startup process to verify that the system has booted
properly.
Preventing Electrostatic Discharge Damage to the JCS 1200 Platform on page 154
JCS 1200 Switch Module Description on page 27
JCS 1200 Switch Module Components and LEDs on page 27
Replacing the Standard CBs in the T-series Routing Platform on page 75
Verifying that the JCS 1200 Platform is Powered On Correctly on page 79
DC OK
command.
)
|
LED lights steadily, and
show chassis

Advertisement

Table of Contents
loading

Table of Contents