Figure 42: Attaching The Cable Management Trays To The Bezel Collar - Juniper JCS 1200 Hardware Manual

Juniper control system platform
Hide thumbs Also See for JCS 1200:
Table of Contents

Advertisement

Juniper Control System (JCS) 1200 Platform Hardware Guide

Figure 42: Attaching the Cable Management Trays to the Bezel Collar

NOTE: Three M4 screws are used to secure the upper cable management tray. Be
sure to insert one screw in the hole closest to the front edge of the bezel collar on
the left side; then use two screws on the right side.
4.
5.
6.
104
Installing a JCS 1200 Bezel Collar
Position the bezel collar so that the light path extension assembly retention
a.
tabs are on your left.
Select one of the cable management trays and align the mounting holes of
b.
the cable management tray with the mounting holes in the bezel collar.
Secure the cable management tray to the collar using the supplied M4 screws
c.
(see Figure 42 on page 104).
Repeat 2 and 3 for the remaining cable management tray.
d.
Remove management module 1 from management module bay 1. See "Removing
a JCS 1200 Management Module or Module Filler" on page 124 for more
information.
Remove the interposer from management module bay 1:
Pull the management module interposer release handle to the open position.
a.
The interposer moves out of the bay approximately 0.25 in. (0.6 cm).
Slide the interposer out of the bay.
b.
Remove any switch modules or module fillers from switch module bays 7 and
8. See "Removing a JCS 1200 Switch Module or Module Filler" on page 143 for
more information.

Advertisement

Table of Contents
loading

Table of Contents