Figure 41: Removing And Installing The Jcs 1200 Bezel Collar - Juniper JCS 1200 Hardware Manual

Juniper control system platform
Hide thumbs Also See for JCS 1200:
Table of Contents

Advertisement

Figure 41: Removing and Installing the JCS 1200 Bezel Collar

To install a JCS 1200 bezel collar (see Figure 41 on page 103):
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
1.
connect the strap to one of the ESD points on the chassis.
If installed, remove the cable management trays from the JCS 1200 platform.
2.
See "Removing the JCS 1200 Cable Management Trays Without a Bezel" on page
110 for more information.
Attach the cable management trays to the bezel collar (see Figure 42 on page 104):
3.
Chapter 10: Replacing Components in a JCS 1200 Platform
Installing a JCS 1200 Bezel Collar
103

Advertisement

Table of Contents
loading

Table of Contents