JCS 1200 Connection to Building Structure

Always secure the rack to the structure of the building. If your geographical area is
subject to earthquakes, bolt the rack to the floor. For maximum stability, also secure
the rack to ceiling brackets.
Related Topics
Overview of Preparing the Site for JCS 1200 Platform Installation on page 33
Site Preparation Checklist for the JCS 1200 Platform on page 33
JCS 1200 Platform Environmental Specifications on page 187
JCS 1200 Connection to Building Structure on page 37

JCS 1200 Clearance Requirements for Airflow and Hardware

Maintenance on page 38
Overview of Preparing the Site for JCS 1200 Platform Installation on page 33
Site Preparation Checklist for the JCS 1200 Platform on page 33
Rack-Mounting Requirements and Warnings for the JCS 1200 Platform on page 156
Chapter 3: Preparing the Site for JCS 1200 Platform Installation
JCS 1200 Connection to Building Structure