Figure 50: Removing And Installing The Jcs 1200 Cable Management - Juniper JCS 1200 Hardware Manual

Juniper control system platform
Hide thumbs Also See for JCS 1200:
Table of Contents

Advertisement

Juniper Control System (JCS) 1200 Platform Hardware Guide
Figure 50: Removing and Installing the JCS 1200 Cable Management Trays
The cable management trays can be installed with or without the JCS 1200 bezel
option. If you are installing the JCS 1200 bezel, see "Installing a JCS 1200
Bezel" on page 98 for more information.
To install the cable management trays without a bezel (see Figure 50 on page 112):
1.
2.
3.
112
Installing the JCS 1200 Cable Management Trays Without a Bezel
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
connect the strap to one of the ESD points on the chassis.
To install the upper cable management tray:
Orient the upper cable management tray so that the captive thumb screws
a.
are oriented toward the Routing Engine bays.
Align the captive thumb screws with the screw holes above switch module
b.
bays 1 and 3.
Use a Phillips-head screwdriver to tighten the captured thumb screws into
c.
the JCS 1200 platform.
To install the lower cable management tray:
Orient the lower cable management tray so that the captive thumb screws
a.
are oriented toward the Routing Engine bays.
Align the captive thumb screws with the screw holes below switch module
b.
bays 2 and 4.
Use a Phillips-head screwdriver to tighten the captured thumb screws into
c.
the JCS 1200 platform.

Advertisement

Table of Contents
loading

Table of Contents