Figure 258: Installing A Control Board - Juniper PTX5000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

Copyright © 2017, Juniper Networks, Inc.
Reconnect the cables.
6.
To verify that the Control Board is installed correctly and functioning normally:
7.
Connect an Ethernet cable to the
the host subsystem is operational, the
If you can run the CLI from a management device attached to the Control Board,
the Control Board is installed correctly.
Verify that the green
The green
LED should light steadily a few minutes after the Control Board is
OK
installed.
Verify that the
on the Control Board faceplate is not lit. If the
FAIL
steadily, remove and install the Control Board again. If the
steadily, the Control Board is not functioning properly. Contact your customer
support representative.
To verify that the Control Board is
command.
NOTE:
Ensure that you Install the Routing Engine RE-DUO-C2600-16G into
the Control Board CB-PTX and the Routing Engine RE-PTX-X8-64G into the
Control Board CB2-PTX only.

Figure 258: Installing a Control Board

Chapter 29: Removing and Installing Host Subsystem Components
HOST/ETHERNET
port LED is lit to indicate Ethernet activity.
ACT
LED on the Control Board faceplate is lit steadily green.
OK
, use the
Online
port on the Control Board. If
LED is lit
FAIL
LED still lights
FAIL
show chassis environment cb
405

Advertisement

Table of Contents
loading

Table of Contents