Juniper PTX5000 Hardware Manual page 287

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

Copyright © 2017, Juniper Networks, Inc.
NOTE:
The management Ethernet port labeled
Control Board is not available until after the initial software configuration.
You can monitor the startup process during the initial installation using
devices connected to the
Turn on power to the external management device.
3.
Switch on the customer-site circuit breakers to provide voltage to the AC power cords.
4.
Verify that the PDUs are receiving power. Verify that the green
5.
green.
Switch on one of the PDUs to by turning its power switch to the on (
6.
NOTE:
After a PDU is powered on, it can take up to 60 seconds for status
indicators—such as the LEDs on the PDU and PSMs, the command output
displays, and messages on the LCD display on the craft interface—to
indicate that the PDU and PSMs are functioning normally. Ignore error
indicators that appear during the first 60 seconds.
Verify that the
PDU OK
7.
the PDU is correctly installed and is functioning properly.
NOTE:
If the
and cabling procedures.
Check the LEDs on the PSMs. For each PSM, verify that the
8.
green.
AUXILIARY
or
LED on the PDU faceplate is lit steadily, which indicates that
LED does not light steadily, repeat the installation
PDU OK
Chapter 22: Powering On the Router
HOST/ETHERNET
CONSOLE
ports.
PDU OK
LED is lit steadily
) position.
|
PSM
LEDs are lit steadily
on the
251

Advertisement

Table of Contents
loading

Table of Contents