PTX5000 Packet Transport Router Hardware Guide
Installing a PTX5000 Control Board
404
Figure 257: Removing a Control Board
To install a Control Board (see
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to an approved site ESD grounding point.
Carefully align the bottom and then the top edges of the Control Board with the guides
2.
inside the chassis.
Slide the Control Board into the chassis, carefully ensuring that it is correctly aligned.
3.
Twist both ejector handles clockwise to seat the host subsystem until the ejectors
4.
latch into the faceplate.
Install the Routing Engine into the Control Board.
5.
NOTE:
If power is applied to the Routing Engine and its corresponding
Control Board is functioning normally, the Control Board comes online
automatically.
Figure 258 on page
405):
Copyright © 2017, Juniper Networks, Inc.