Installing The Control Board (Cb2-Ptx); Figure 265: Installing The Cb2-Ptx Control Board - Juniper PTX5000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

Installing the Control Board (CB2-PTX)

Copyright © 2017, Juniper Networks, Inc.

Figure 265: Installing the CB2-PTX Control Board

To install a Control Board (see
Attach an ESD grounding strap to your bare wrist, and connect the strap to an approved
1.
site ESD grounding point.
Carefully align the bottom and then the top edges of the Control Board with the guides
2.
inside the chassis.
Slide the Control Board into the chassis, carefully ensuring that it is correctly aligned.
3.
Twist both ejector handles clockwise to seat the host subsystem until the ejectors
4.
latch into the faceplate.
To verify that the Control Board is installed correctly and functioning normally:
5.
a. Connect an Ethernet cable to the
the host subsystem is operational, the
activity. If you can run the CLI from a management device attached to the Control
Board, the Control Board is installed correctly.
b. Verify that the green
The green
LED should light steadily a few minutes after the Control Board is
OK
installed.
c. Verify that the
on the Control Board faceplate is not lit. If the
FAIL
steadily, remove and install the Control Board again. If the
steadily, the Control Board is not functioning properly. Contact your customer
support representative.
d. To verify that the Control Board is
command.
Chapter 30: Upgrading to RE-PTX-X8-64G Routing Engines
Figure 265 on page
415):
HOST/ETHERNET
port LED is lit to indicate Ethernet
ACT
LED on the Control Board faceplate is lit steadily green.
OK
, use the
Online
port on the Control Board. If
LED is lit
FAIL
LED still lights
FAIL
show chassis environment cb
415

Advertisement

Table of Contents
loading

Table of Contents