Installing A Ptx5000 Three-Phase Wye Ac Pdu Power Cord; Figure 210: Removing The Metal Retaining Bracket And Ac Power Cord; Figure 211: Attaching The Metal Retaining Bracket To The Ac Power Cord - Juniper PTX5000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

Installing a PTX5000 Three-Phase Wye AC PDU Power Cord

Copyright © 2017, Juniper Networks, Inc.

Figure 210: Removing the Metal Retaining Bracket and AC Power Cord

To install a three-phase wye AC power cord:
Ensure that the voltage across the AC power source is 0 V and that there is no chance
1.
that the voltage might become active during installation.
Switch the circuit breaker and power
2.
Gently push the AC power cord wires through the hole in the metal retaining bracket.
3.
Screw the retaining nut onto the AC power cord to secure the metal retaining bracket
to the replacement AC power cord (see

Figure 211: Attaching the Metal Retaining Bracket to the AC Power Cord

1 1
2
1—
Retaining nut
2—Metal retaining bracket
Using a number 2 Phillips (+) screwdriver, loosen the two captive screws on the metal
4.
AC wiring compartment. Open the metal door of the metal AC wiring compartment.
Gently push the wires of the AC power cord into the area for the metal retaining bracket,
5.
and pull the wires to the left toward the metal AC wiring compartment. Using a number
2 Phillips (+) screwdriver, use the four screws on the metal retaining bracket to secure
the AC power cord to the PDU (see
Chapter 27: Removing and Installing Power System Components
OUTPUT
switch on the PDU to the off (
Figure 211 on page
3
3—
Three-phase wye AC power cord
Figure 212 on page
338).
O
) position.
337).
337

Advertisement

Table of Contents
loading

Table of Contents