Provision The Network Ports - ADTRAN Total Access 5000 Deployment Manual

Hide thumbs Also See for Total Access 5000:
Table of Contents

Advertisement

3. Type  end , and press Enter to return to the Enable prompt.

Provision the Network Ports

To configure the network port administration states, complete the following procedure:
NOTE
This is a single node setup, therefore Network Port 2 will be set to the Out of
Service‐Unassigned state. This prevents any unnecessary alarms for the
unused network port.
1. From the Enable prompt, type  configure terminal , and press  E
2. From the Global Configuration prompt, type  interface gigabit-ethernet 1/A/1 , 
3. Type  no shutdown , and press  E
4. Type  interface gigabit-ethernet 1/A/2 , and press  E
5. Type  shutdown , and press  E
6. Type  exit , and press  E
7. Type  interface gigabit-ethernet 1/B/1 , and press  E
8. Type  no shutdown , and press  E
9. Type  interface gigabit-ethernet 1/B/2 , and press  E
10. Type  shutdown , and press  E
11. Type  end , and press  E
NOTE
The GigE SM  NET 1  LED should be green. If not, perform physical layer
diagnostics.
65K510DEP08-1A
bal Configuration prompt.
and press  E
 to access the slot A, Net 1 Configuration prompt.
NTER
Configuration prompt.
NTER
Configuration prompt.
Configuration prompt.
NTER
Section 3, Common Provisioning - Provision the GigE SM
NTER
 to set the port to In Service.
NTER
 to set the port to Out of Service, Unassigned.
 to return to the Global Configuration prompt.
NTER
 to set the port to In Service.
NTER
 to set the port to Out of Service, Unassigned.
 to return to the Enable prompt.
NTER
 to access the Glo‐
NTER
 to access the slot A Net 2 
NTER
 to access the slot B, Net 1 
NTER
 to access the slot B, Net 2 
3-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ta 5000

Table of Contents