Appendix A
Scope of this Appendix
This appendix details the steps needed to provision/remove link aggregation. Net 1 and Net 2
of the GigE SM can be combined to provide a 2 Gbps connection to upstream network
equipment.
NOTE
• A link aggregation group cannot be connected in the downstream direction
to any subtended nodes.
• Ensure all front panel ports on the Active and Standby switch modules are
physically connected to the upstream networking equipment.
In this Appendix
This appendix contains the following topics:
Topic
Link Aggregation Provisioning
Remove Link Aggregation Provisioning
65K510DEP08-1A
Link Aggregation Guide
Table A-1. Appendix A Topics
See Page
A‐2
A‐6
A-1