Eotdm Overview; Figure 6-1. Eotdm (Clear Channel) Diagram; Figure 6-2. Eotdm (Channelized) Diagram - ADTRAN Total Access 5000 Deployment Manual

Hide thumbs Also See for Total Access 5000:
Table of Contents

Advertisement

Total Access 5000 Business Services Deployment Guide

EoTDM Overview

This subsection details the steps needed to provision EoTDM using the DS3 Ethernet in the 
First Mile (EFM) Access Module and the NetVanta 800. This section provides the following 
information:
• Inband management configuration for the SCM and the NetVanta 800 Network Circuit 
• Minimum configuration for traffic to pass from the GigE SM port to an Ethernet port on 
Figure 6‐1  and Figure 6‐2 display an overview of the EoTDM deployment.
6-2
Terminating Equipment (NCTE)
the NetVanta 800
Total Access 5000
Bridge
EP2
EP1
Group #1
1
NET 1
2
EP1
EP2
Bridge Group
"Phycical Links"
GigE VLAN
2010 +2020
Management
VLAN 2048
Metro
Ethernet
Network
Total Access 5000 "Cross Connect"
1
• End Point 1→ PORT, NET 1
• End Point 2→ Bridge, Bridge Group 1
• S-tag = 2010
Total Access 5000 "Cross Connect"
2
• End Point 1→ PORT, NET 1
• End Point 2→ Bridge, Bridge Group 1
• S-tag = 2020

Figure 6-1. EoTDM (Clear Channel) Diagram

Total Access 5000
Bridge
EP2
EP1
Group #1
1
NET 1
2
EP1
EP2
Bridge Group
"Phycical Links"
GigE Q VLAN
2010 +2020
Metro
Ethernet
Network
1
Total Access 5000 "Cross Connect"
• End Point 1→ PORT, NET 1
• End Point 2→ Bridge, Bridge Group 1
• S-tag = 2010
2
Total Access 5000 "Cross Connect"
• End Point 1→ PORT, NET 1
• End Point 2→ Bridge, Bridge Group 1
• S-tag = 2020

Figure 6-2. EoTDM (Channelized) Diagram

NetVanta 873
EoTDM
System Diagram
DS3
PORT 1
DS3 #1
DS3
PORT 2
DS3 #2
DS3
PORT 3
DS3 #3
PORT 4
3
NetVanta 873 Entities/Commands
EVC EVC-2010
MEN- PORT EFM-Group 1
S-TAG 2010
NetVanta 873 Entities/Commands
5
EVC-MAP MAP-2010
UNI ETH 1
Connect-EVC EVC-2010
NetVanta 818
EoTDM
System Diagram
PORT 1
DS1 #1
DS1s
DS3s
PORT 2
DS1 #2
PORT 3
DS1 #3
MUX
3
NetVanta 818 Entities/Commands
EVC EVC-2010
MEN- PORT EFM-Group 1
S-TAG 2010
5
NetVanta 818 Entities/Commands
EVC-MAP MAP-2010
UNI ETH 0/1
Connect-EVC EVC-2010
Available EVC's and
Management VLAN
Pushed Down by
Total Access 5000
Bridge Group #1
EFM
Group #1
5
ETH 1
VLAN
3
MAP 2010
2010
ETH 2
4
MAP 2020
6
ETH 3
VLAN
EVC 2020
2020
ETH 4
4
NetVanta 873 Entities/Commands
EVC EVC-2020
MEN- PORT EFM-Group 1
S-TAG 2020
6
NetVanta 873 Entities/Commands
EVC-MAP MAP-2020
UNI ETH 3
Connect-EVC EVC-2020
Available EVC's
Pushed Down by
Total Access 5000
Bridge Group #1
EFM
Group #1
5
ETH 1
VLAN
3
MAP 2010
2010
ETH 2
4
MAP 2020
6
ETH 3
VLAN
EVC 2020
2020
ETH 4
4
NetVanta 818 Entities/Commands
EVC EVC-2020
MEN- PORT EFM-Group 1
S-TAG 2020
NetVanta 818 Entities/Commands
6
EVC-MAP MAP-2020
UNI ETH 0/3
Connect-EVC EVC-2020
65K510DEP08-1A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ta 5000

Table of Contents