Fusing Unit
8.
Entrance guide plate [A] (
9.
Pressure roller [B] (
The pressure roller and pressure roller bearing should always be replaced together.
10. Lubricate the inner and outer surfaces [C] of the bushings with Barrierta S552R grease.
If the bushings are warm, allow them to cool before applying the Barrierta grease.
Applying the grease while the bushings are hot could generate gas.
D131/D132/D133
x 2)
x 2)
4-80
SM