Concluding Steps - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Processors

11.4.4 Concluding steps

Perform the following procedures to complete the task:
Ê Install the processor heat sink onto the processor as described in section
"Installing processor heat sinks" on page
Ê Reinstall the air duct as described in section
on page
94.
Ê Close the side / top cover as described in section
on page 107
(rack server) or
server).
Ê When working on a rack-mounted server, secure it in the rack as described
in section
"Sliding the server into the rack" on page
If the server has been completely removed from the rack for maintenance
purposes, reinstall and secure it in the rack as described in section
"Mounting the server in the rack" on page
Ê Reconnect the AC power cords to the power supply units and secure them
with PSU cable brackets as described in section
the mains" on page
Ê If available, update the system board BIOS and the iRMC to the latest
version as described in section
BIOS and iRMC" on page
Ê Enable boot watchdog functionality as described in section
boot watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
586
"Mounting the side cover" on page 114
125.
"Updating or recovering the system board
139.
156.
Upgrade and Maintenance Manual
588.
"Installing the system air duct"
"Mounting the top cover"
124.
122.
"Connecting the server to
150.
(tower
"Enabling SVOM
"Enabling
TX300 S7 / RX350 S7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy tx350 s7

Table of Contents