Preliminary Steps - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Processors

11.4.2 Preliminary steps

Before upgrading or replacing the processor, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Disable boot watchdog functionality as described in section
SVOM boot watchdog functionality" on page
Ê If applicable, locate the defective server as described in section
the defective server" on page
Ê Shut down the server as described in section
page
67.
Ê Remove the AC power cords from the PSU cable brackets and disconnect
them from the system as described in section
from the mains" on page
Ê When working on a rack-mounted server, extend it out of the rack as
described in section
If further required, remove the server from the rack as described in section
"Removing the server from the rack" on page
Ê Bring the server to its horizontal position.
Ê Open the side / top cover as described in section
on page 75
(rack server) or
server).
Ê Remove the air duct as described in section
on page
92.
Ê Remove the desired processor heat sink as described in section
processor heat sinks" on page
576
133.
60.
68.
"Extending the server out of the rack" on page
"Removing the side cover" on page 84
592.
Upgrade and Maintenance Manual
"Disabling BitLocker
"Disabling
134.
"Shutting down the server" on
"Disconnecting the server
73.
"Removing the top cover"
"Removing the system air duct"
TX300 S7 / RX350 S7
"Locating
72.
(tower
"Removing

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy tx350 s7

Table of Contents