Switching On The Server - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

4.13

Switching on the server

V
CAUTION!
Before switching on the server, make sure the top / side cover is
closed. In order to comply with applicable EMC regulations
(regulations on electromagnetic compatibility) and satisfy cooling
requirements, the PRIMERGY TX300 S7 / RX350 S7 server must
not run while the top / side cover is removed.
Follow the safety instructions in chapter
page
47.
Ê Connect all peripheral cables to the rear connector panel of the server.
Ê Connect and secure the power cords as described in section
the server to the mains" on page
Ê Connect all power cords to the power outlets.
I
To provide true phase redundancy, the second power supply should
be connected to a different AC power source from the other supply. If
one AC power source should fail, the server will still continue to run.
Figure 69: On / Off button on the front panel
Ê Press the On / Off button to start up the server.
Ê Ensure that the power-on indicator above the On / Off button is lit green.
I
For more information, refer to section
indicators" on page
TX300 S7 / RX350 S7
125.
894.
Upgrade and Maintenance Manual
Basic hardware procedures
"Important information" on
"Connecting
"Front panel controls and
131

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy tx350 s7

Table of Contents