BRKT

Installing the PTT unit

1. Fully tilt the outboard motor up, and then
support it with the tilt stop lever 1.
WARNING
• When installing the PTT unit with the
power unit installed, be sure to suspend
the outboard motor. If the outboard
motor is not suspended it can fall sud-
denly and result in severe injury.
• After tilting the outboard motor up, be
sure to support it with the tilt stop lever.
2. Install the PTT unit mounting bolts 2
onto both clamp brackets together with
the PTT unit 3, and then tighten them.
3. Install the upper end of the tilt ram into
the swivel bracket with the shaft 4 and
circlip 5.
4. Tighten the self-locking nut 6 of the
through tube to the specified torque.
NOTE:
• Make sure that the flat corner a of the
through tube is pointing down as shown
before tightening the self-locking nut 6.
• Do not pinch the trim sensor pin when
down the swivel bracket.
5. Install the anode 7 and ground lead.
6. Install the PTT motor lead to the holder
8.
7-27
Bracket unit
Self-locking nut 6:
22 N·m (2.2 kgf·m, 16.2 ft·lb)
7. Pass the PTT motor lead and trim sensor
lead through the hole b in the starboard
clamp bracket.
8. Fasten the PTT motor lead and trim sen-
sor lead with the plastic ties 9, and then
install the holder 0.
9
9
9. Inject grease into all grease nipples until
grease comes out from the bushings c.
STBD
b
9
;
9
S6AL7590