BRKT
Disassembling the bottom cowling
1. Remove the shift bracket assembly 1,
and then remove the flushing hose joint
adapter 2.
2
1
NOTE:
• If the power unit is installed, remove the
starboard intake manifold and dipstick
guide, and then remove the shift bracket
assembly 1.
• See the exploded diagrams (4-9, 5-33).
2. Remove the shift rod assembly 3.
NOTE:
The shift rod assembly 3 cannot be removed
when the power unit is installed.
3. Remove the plates 4 and clamp 5, and
then pull out the trim sensor lead 6, PTT
motor lead 7, and flushing hose 8.
4. Remove the wire lead extension 9
(counter rotation model).
7-5
Bracket unit
S6AL7030
3
S6AL7040
È
4
7
Ê
É
4
7
Ê
È Regular rotation model
É Counter rotation model
Ê To the PTT relay
Ë To the cooling water passage cover (via the
joint)
5. Remove the holder 0 (regular rotation
model) and holder A, and then remove
the PTT switch B.
È
0
STBD
Ë
8
5
6
S6AL7060
Ë
8
5
6
9
S6AL7A30
A
B
S6AL7050
6AL3J11