SELVA MARINE Grey Whale 200 EFI Service Manual page 178

Table of Contents

Advertisement

POWR
5. Install the wiring harness onto the wiring
harness guide with the mark a facing
upward, and then insert the projections
b on the plastic ties 5 into the holes in
the wiring harness guide in the sequence
shown.
6. Fasten the wiring harness using the plas-
tic ties.
5
b
5
±
NOTE:
• Be sure to install the wiring harness onto
the wiring harness guide so that the wiring
harness does not protrude above the top
edge of the wiring harness guide.
• Be sure to install the wiring harness
between the swells c.
7. Install the sub wiring harness, fuse box,
PTT relay, and Rectifier Regulator to the
junction box.
NOTE:
To install the sub wiring harness, fuse box,
PTT relay, and Rectifier Regulator to the
junction box, see the exploded diagram (5-
37, 5-36).
8. Install the junction box onto the power
unit, and then tighten the bolts tempo-
rarily.
9. Install the wiring harness to the junction
box, and then fasten the wiring harness
at the white tape d and the sub wiring
harness at the white tape e using the
plastic ties 6.
10. Install the plastic ties 7, 8, and 9.
5-77
Power unit
!
5
a
c
#
S6AL5610
11. Fasten the oil pressure sensor lead 0,
isolator lead A, and positive terminal
lead B with its cap using the plastic tie
C, making sure to align the white tape f
on the oil pressure sensor lead 0 with
the guide of the positive battery terminal.
9
NOTE:
• Do not fasten the PTT relay lead D with the
plastic tie 7.
• It is recommended to temporarily install the
plastic ties to the sections g of the junction
box to improve working efficiency.
12. Tighten the junction box bolts com-
pletely.
13. Install the terminals of the starter motor
lead (brown/white) and the wiring har-
ness lead (brown) using the same bolt.
g
d
6
D
7
e
6
g
8
g
B
C
f
A
0
S6AL5590
S6AL5H30
6AL3J11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fin whale 225 efi

Table of Contents