Rrp: Power Supply; Removal - IBM TotalStorage SAN32M-1 Installation And Service Manual

Hide thumbs Also See for TotalStorage SAN32M-1:
Table of Contents

Advertisement

RRP: power supply

Removal

356
SAN32M-1 Installation and Service Manual
a. Ensure no alert symbols appear that indicate a failure (yellow
triangle or red diamond).
b. Click the port graphic representing the replacement SFP to
open the Port Properties dialog box. Verify that port
information (port number, port name, operational state, and
port technology) is correct.
If a problem is indicated, go to
to isolate the problem.
8. Restore communication to the port and set the port online as
directed by the customer
9. Perform the data collection procedure
on page 325).
10. Clear the switch's system error (ERR) LED:
— If at the EFC Server, open the Hardware View and:
a. Right-click the front panel bezel graphic (away from a FRU) to
open a pop-up menu.
b. Click Clear System Error Light.
— If at a web browser connected to the EFCM Basic interface:
a. Click the Switch tab at the Operations panel. The Operations
panel opens with the Switch page displayed.
b. Click the Sys Err Light tab. The Switch page displays with the
Sys Err Light tab selected. A System Error Light is ON
message displays on the page.
c. Click Clear Light.
Use the following procedures to remove or replace a power supply
from the rear of the switch. No tools are required.
To remove a power supply:
1. Identify the defective power supply from the extinguished green
LED at the switch or failure information at the EFC Server's
Hardware View.
MAP 0000: Start MAP
(Unblock a port
on page 336).
(Collecting maintenance data
on page 183

Advertisement

Table of Contents
loading

Table of Contents