Task 3: Unpack, Inspect, And Install The Switch; Unpack And Inspect The Switch; Desktop Installation - IBM TotalStorage SAN32M-1 Installation And Service Manual

Hide thumbs Also See for TotalStorage SAN32M-1:
Table of Contents

Advertisement

Task 3: Unpack, inspect, and install the switch

Unpack and inspect the switch

Desktop installation

7. Inspect the front panel of each hub. Ensure each green Power LED
illuminates.
The following paragraphs provide instructions to unpack and inspect
the switch, and install it in a desktop or rack-mount configuration.
If the switch is delivered (with the Ethernet hub and management
server) as part of an equipment cabinet, refer to the document
provided with the cabient for unpacking and installation instructions,
then go to
Task 4: Configure network information
Unpack and inspect the switch:
When you remove the switch from the carton, do not rest it on its
rear panel while examining it. To do so may break the FRU handles.
1. Inspect the shipping container(s) for damage caused during
transit. If a container is damaged, ensure a representative from
the freight carrier is present when the container is opened.
2. Unpack the shipping container(s) and inspect each item for
damage. Save all shipping and packing materials.Ensure that all
items on the enclosed shipping list are in each container.
3. If any items are damaged or missing, contact the IBM Quality
Hotline toll-free at 1-800-442-6773 within the United States and
Canada. In other locations direct dial 770-858-8459.
To install and configure the switch on a desktop:
1. Remove the backing from the four adhesive rubber pads and
apply the pads to the underside of the switch. Ensure the pads are
aligned with the scribed circles at each corner.
2. Position the switch on a table or desktop as directed by the
customer. Ensure:
— Grounded AC electrical outlets are available.
— Adequate ventilation is present.
on page 65.
Chapter 2: Installation tasks
63

Advertisement

Table of Contents
loading

Table of Contents