Lcd Panel During Boot Sequence - IBM TotalStorage SAN32M-1 Installation And Service Manual

Hide thumbs Also See for TotalStorage SAN32M-1:
Table of Contents

Advertisement

Figure 21
74
SAN32M-1 Installation and Service Manual
a. As shown in
Figure
supplied Ethernet patch cable to the left RJ-45 adapter (LAN 1)
at the rear of the server.
b. Connect the remaining end of the Ethernet cable to the
corporate intranet as directed by the customer's network
administrator.
7. As shown in
Figure
RJ-11 adapter (LINE) at the rear of the server and to a facility
telephone connection.
8. As shown in
Figure
and to a facility power source or rack power strip that provides
single-phase, 90 to 264 VAC current.
9. When the power cord is connected, the management server
powers on and performs power-on self-tests (POSTs). During
POSTs:
a. The green liquid crystal display (LCD) panel illuminates.
b. The green hard disk drive (HDD) LED blinks momentarily,
and processor speed and random-access memory information
display momentarily at the LCD panel.
c. After a few seconds, the LCD panel displays the following
message pertaining to boot sequence selection
Boot from LAN?
Press <Enter>

LCD panel during boot sequence

d. Ignore the message. After ten seconds, the server performs the
boot sequence from the basic input/output system (BIOS).
During the boot sequence, the server performs additional
POSTs and displays the following information at the LCD
panel:
• Host name.
• System date and time.
• LAN 1 and LAN 2 IP addresses.
• Fan 1, fan 2, fan 3, and fan 4 rotational speed.
20, connect one end of a customer-
20, connect the 20-foot phone cord to the left
20, connect the AC power cord to the server
(Figure
21):

Advertisement

Table of Contents
loading

Table of Contents